The proposed 515-mile transmission line could . SunZia Wind and Transmission will deliver widespread economic benefits across New Mexico and Arizona, with an estimated investment of over $8 billion. SunZia Southwest Transmission Project is Electric Utilities in United States that focus on substations that business. If approved, this project aims to transport up to 4,500 MW of energy from New Mexico to markets in Arizona and California. The SunZia Southwest Transmission Project is approximately 520miles long, and traverses portions of Arizona and New Mexico. The SunZia Project is one of six priority projects of the Obama Administration's Rapid Response Team for Transmission, which works to improve the overall quality and timeliness of permitting for . SouthWestern Power Group will maintain ownership of a second 500 kV high voltage-alternating . Francis Energy says that they've managed to work through some of the backlog and they're starting to get more supplies in to continue construction. Only one of the two 500-kV circuits will be constructed in Phase 1 and the planned in-service date for the first transmission . Pattern Energy announced plans Monday to invest $8 billion in New Mexico-based wind generation and new transmission infrastructure after acquiring partial ownership over the SunZia Southwest Transmission Project. The project originates at the new SunZia East . 01 / 02. U.S. SouthWestern Power Group was the original developer of the SunZia Southwest Transmission Project, which will transport energy from Arizona and New Mexico to customers and markets across the Desert Southwest. The proposed SunZia Southwest Transmission Project (Project) comprises two planned 500 kilovolt (kV) transmission lines located across approximately 520 miles of Federal, State, and private lands between central New Mexico and central Arizona. The Bureau of Land Management has opened a 90-day public comment period to collect public comments on the potential environmental impacts associated with proposed amendments to the SunZia Southwest Transmission Project authorized by the BLM in 2015. The SunZia Southwest Transmission project is both flexible and unusual, comprising two 515-mile-long, single-circuit 500 kV transmission lines located next to each other. The relevant Notice of . SunZia Southwest Transmission Project SunZia, formed by ECP and five partners, is developing the first phase of a 460-mile high-capacity transmission project planned between Arizona and New Mexico. Authentically local independent news | a smarter Tucson is a bettter Tucson | Watchdog reporting & community views The SunZia project, under development since the mid 2000s, would run about 550 miles from central New Mexico to central Arizona, according to SunZia Transmission. SunZia Southwest Transmission Project Arizona Corporation Commission Biennial Transmission Assessment Workshop Phoenix, AZ May 22 23, 2008 2 Energy Corridor 2 3 Project Study Area 3 4 Project Benefits. SANTA FE, N.M. - The Bureau of Land Management opens a 30-day public scoping period to collect public comments and identify potential issue of the SunZia Southwest Transmission Project. The proposed SunZia Southwest Transmission Project is composed of two planned 500 kilovolt transmission lines located across approximately 520 miles of Federal, State, and private lands between central New Mexico and central Arizona. The system will span 500 mi between Arizona and New Mexico. SunZia is a 515-mile, 500kV independent transmission project that will connect high-quality wind and solar resources in New Mexico and southern Arizona with markets in the West. The Southwestern Power Group has been working since 2008 to develop SunZia, a massive transmission project that would carry wind-generated electricity from Central New Mexico to Arizona for export . The Southwestern Power Group has been working since 2008 to develop SunZia, a massive . Conceptualized in 2006, the project team continuously worked with landowners, communities, and government entities at state and federal levels, to establish the most environmentally responsible and efficient path across New Mexico and Arizona. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations. The SunZia line will have the capacity to deliver up to 4,500 megawatts of renewable energy and begin addressing the needs of our growing population. The SunZia Project includes two nominal 500 kilovolt (kV) transmission lines located on federal, state, and private lands. Last edited 9/29/2021. The SunZia project is an electricity transmission project that will deliver 3,000 to 4,500 MW of clean energy to the Western United States. For that reason, the Santa Fe Green Chamber of Commerce again offers its full . 515 mile, 500 kV independent transmission project Brings high-quality renewable energy to AZ and CA markets WECC granted Phase 3 status in Mar 2011, which affirmed a . CONTACT (602) 808-2004. This week, correspondent Laura Paskus talks to John Ryan, SunZia New Mexico executive director, and Sandra Noll, who lives in Socorro County and worries how the project will affect migrating birds, ecotourism and the . The proposed project is composed of two planned 500 kilovolt (kV) transmission lines located across approximately 520 miles of land in New Mexico and Arizona, including approximately 5 miles on the Magdalena Ranger District in Socorro County, NM. SunZia Southwest Transmission Project Delivering Clean Energy to the West. Bureau of Land Management in Socorro at 901 Old US Hwy 85. The Southwestern Power Group has been working since 2008 to develop . SunZia is comprised of two extra high voltage lines and the . SunZia Southwest Transmission Project B1-3 Draft Environmental Impact Statement and Resource Management Plan Amendments 1.1.2 State Laws 1.1.2.1 Arizona The State of Arizona has no threatened and endangered species laws. That $4 billion project is supposed to someday bring wind-generated power from New Mexico to markets in Arizona and California. In July 2022, Pattern Energy acquired the SunZia Transmission Project. The SunZia Southwest Transmission Project consists of two bi-directional, extra-high voltage electric transmission lines and substations that will transport energy from Arizona and New Mexico to customers and markets across the Desert Southwest. Lincoln Laboratory to . The proposed transmission line route would be approximately 460 miles in length. The SunZia Southwest Transmission Project is seeking an alternative route to move its massive clean energy line out of White Sands Missile Range and away from sensitive wildlife refuges in Socorro . We're confident the SunZia transmission project stands to benefit communities across our state for years to come. SunZia is a 500 kV transmission project consisting of approximately 500 miles of two separate 500 kV alternating current (AC) transmission lines in mainly parallel corridors, including up to five substations. Senator Martin Heinrich (D-N.M.) has announced a key development in reaching common ground on the SunZia Southwest Transmission Project in New Mexico. The primary purpose of the line is to connect remotely sited renewable energy sources - wind, solar and geothermal projects - in both states to . The scoping period will end on July 6, 2021. May 15, 2014 . The SunZia Southwest Transmission Project is two transmission lines totaling 520 miles beginning at the SunZia East Substation near Corona, New Mexico and ending at the existing Pinal Central . It is slated to have a 3,000-MW . SunZia Transmission and SunZia Wind together comprise the largest renewable energy infrastructure project in U.S. history with a total investment of over $8 billion; Construction expected to begin . Blm Federal Register Notices will sometimes glitch and take you a long time to try different solutions. The SunZia project would enable the development of renewable energy resources including wind, solar, and geothermal generation by creating access to the interstate power grid in the Southwest. The 550-mile SunZia Southwest Transmission Project renewable energy transmission line will have a substation in Graham County. "The SunZia Southwest Transmission Line is proof that New Mexico is leading the charge in the clean energy transition," U.S. Sen. Martin Heinrich, a New Mexico Democrat, said in a press release. We should expect five more stations to go . SunZia has asked the BLM to amend the right-of-way alignments the federal agency approved on Sept. 1, 2016, according to the commission's hearing examiner. The proposed SunZia Southwest Transmission Project is composed of two planned 500 kilovolt transmission lines located across approximately 520 miles of Federal, State, and private lands between central New Mexico and central Arizona. The Bureau of Land Management has opened a 90-day public comment period seeking input on the SunZia Southwest Transmission Project and the potential environmental impacts associated with proposed amendments. The SunZia Project will be constructed in two phases and ultimately include two, new, single-circuit, 500 kV transmission lines with the intent of locating both within a single 400-foot-wide right-of-way, where possible. Pattern Energy announced plans Monday to invest $8 billion in New Mexico-based wind generation and new transmission infrastructure after acquiring partial ownership over the SunZia Southwest Transmission Project. SunZia Transmission previously awarded the full 3,000 MW of capacity on the transmission line to Pattern Energy. It's free to sign up and bid on jobs. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The purpose of the Project is to transport up to 4,500 megawatts of primarily renewable energy from . The SunZia Southwest Transmission Project (SunZia or the Project) is a major new 500 kilovolt (kV) transmission project that will provide additional transmission interconnections and transmission capacity between central New Mexico and central Arizona. The line was intended to bolster renewable energy resources, allowing power generated in New Mexico to be sold in . The SunZia Southwest Transmission Project just passed its final environmental review by the Interior Department's Bureau of Land Management (BLM). The SunZia Transmission project was expected to achieve commercial operation in 2020. Pattern Energy is developing the SunZia Wind project, a 3,000+ MW facility in New Mexico, which will utilize the SunZia transmission line to provide enough safe, affordable, and renewable electricity to power the needs of 2.5 million Americans annually. July 24, 2012. The purpose of the Project is to transport up to 4,500 megawatts of primarily renewable energy from New Mexico . SunZia estimates the project would provide 6,000 construction jobs for four years. Provides delivery of renewable resources (solar, wind, and geothermal) to markets ; See the reports it filed. SunZia Southwest Transmission Project Subscribe to this feed . Phoenix, AZ . SunZia Southwest Transmission Project. Public input sought on SunZia project. The line is expected to play a crucial role in meeting the . Project . September . SUNZIA SOUTHWEST TRANSMISSION PROJECT JULY 27, 2018 4 Economic Benefits in New Mexico During Construction Jobs1 Labor Income State Taxes 1County Taxes During Operation Jobs Labor Income State Taxes2 County Taxes2 First 500 kV AC Line 33 $1.9 M $.385 M $4.32 M Email Us. Search for jobs related to Sunzia southwest transmission project or hire on the world's largest freelancing marketplace with 20m+ jobs. . The full text of these documents can be found here. The SunZia Southwest Transmission Project is two 514-mile single circuit 500-kV transmission lines located adjacent to one another. The SunZia Southwest Transmission Project is an extra-high-voltage transmission system that will deliver clean renewable energy to customers in the southwest and enhance the reliability of the existing electrical grid. Of that investment, an estimated $800 million will go to governments, communities, schools, and landowners across New Mexico and Arizona. Contact. SunZia will enable the The SunZia Southwest Transmission Project's long, winding road to commercial operation is facing a new round of controversy, this time from an array of community groups that fear the huge . About. Transmission Project . Published May 6th, 2022 at 12:31 pm. When work begins in early 2023, the more than $8-billion SunZia transmission and wind project will become the nation's largest single-phase renewable energy project, according to its developers . 1/24/2015. "We are pleased to be working with the SunZia Southwest Transmission Project Team and are collaborating with them on the resubmittal of the application to the New Mexico Public Regulation . Key contractors Project is yet to be contracted Scheduled completion 2018 Contact Name Tom Wray, Project Manager Address 3610 North 44th Street, Suite 250, Phoenix, AZ 85018, USA Telephone +1 602 808 2004 Email twray@southwesternpower.com Website www.sunzia.net Source: Global Transmission Research; company websites; press reports Contact. They cover business area such as owner, operator, electric transmission line, substation, energy, Arizona, New Mexico, customer. SunZia would "Once completed, this project will result in the largest wind farm in the Western Hemisphere, having produced over 6,000 construction jobs and . SunZia Southwest . Renewable energy giant acquires SunZia transmission project. Arizona Corporation Commission . SUNZIA OUTHWEST TRANSMISSION PROJECT 9/1/2016 2 SouthWestern Power Group Independent developer of utilityscale generation and transmission in the Desert Southwest Project Manager/Developer of SunZia Based in Phoenix, staff of ten: 175 years of experience, in business for 16 yrs Major References: ~ 2,400 MW CCGT Panda Gila River power plant (in operation) The proposed SunZia Southwest Transmission Project includes two planned 500 kV transmission lines located across approximately 520 miles of federal, state, and private lands between central New Mexico and central Arizona. It includes two new 500-kV transmission lines and five new . June 13, 2013 Carl Dombek Intelligence. These EHV facilities will be constructed between south-central New Mexico and south-central Arizona (see SunZia Project . LoginAsk is here to help you access Blm Federal Register Notices quickly and handle each specific case you encounter. The SunZia Southwest Transmission Project would originate in Torrance County south of Albuquerque and would transport up to 4,500 megawatts (MW) of energy west into Arizona, terminating in Pinal County, Arizona south of Phoenix. Following months of close coordination with the Department of Defense and White Sands Missile Range . Arizona Office 3610 N. 44th Street, Suite 250 Pattern Energy Group LP has acquired the SunZia Transmission project from SouthWestern Power Group, a wholly owned subsidiary of MMR Group, Inc. SunZia Transmission consists of a 550-mile bi-directional 525 kV high-voltage direct current (HVDC) transmission line between central New Mexico and south-central Arizona, with the capacity to transport up to 3,000 MW of clean, renewable energy. The Project comprises two single-circuit 500kV alternating-current transmission lines and a number of substations, with an east to west rating of 3,000 MW. The lines may be operated as two 500 kV AC lines capable of transmitting 3,000 MW of wind, solar and geothermal power, or they may be operated as one 500 kV AC and one 500 kV . SunZia Southwest Transmission Project spent $127,000 lobbying in 2014. Before the current comment deadline of July 6, submit a vocal statement to the bureau at 1-888-959-2510, and demand that "project abandonment" be formally analyzed as an alternative in SunZia . BLM is carrying out this environmental review in response to the company's application to amend its 2016 right-of-way . The mighty winds of New Mexico could soon power homes and businesses in Arizona and California. The SunZia Southwest Transmission Project (SunZia or the Project) is a major new 500 kilovolt (kV) transmission project that is envisioned to provide additional transmission interconnections and transmission capacity between central New Mexico and central Arizona. 2011 . Developer: SunZia Transmission LLC (Pattern Energy Group LP and SouthWestern Power Group, a wholly owned subsidiary of MMR Group, Inc.) Project details and status: SunZia Southwest is a double-circuit 500 kV transmission project that will stretch across southern New Mexico and Arizona. SunZia sponsors including Shell WindEnergy, Tri-State Generation, and Southwestern Power Group hope to . Arizona Office 3610 N. 44th Street, Suite 250 These benefits are generated through sales & use . Pattern Energy is developing the SunZia Wind project, a 3,000+ MW facility in New Mexico, which will utilize the SunZia transmission line to provide enough safe, affordable, and renewable electricity to power the needs of 2.5 million Americans annually. Wind developers, including Pattern Energy Group Inc.'s Pattern Energy Group LP, the anchor tenant for . That's why the Bureau of Land Management (BLM) was studying the environmental impact of the proposed SunZia Southwest Transmission Project and amendments the agency approved in 2015. Learn more about SunZia Transmission. The U.S. Bureau of Land Management (BLM) has refined its preferred route for the proposed SunZia Southwest transmission project, with a route detailed in the final environmental impact statement (EIS) that is some 15 miles shorter than the route in the draft EIS issued more than a year ago. SunZia Southwest Transmission Project to Generate Clean Energy Jobs, Strengthen Nation's Energy Security. The SunZia Southwest Transmission Project consists of two bi-directional, extra-high voltage electric transmission lines and substations that will transport energy from Arizona and New Mexico to customers and markets across the Desert Southwest. The Bureau of Land Management (BLM), after a multi-year environmental review process, has released the Final Environmental Impact Statement (EIS) and two related Proposed Resource Management Plan Amendments (RMPAs) for the SunZia Southwest Transmission Project. The BLM encourages substantive comments concerning the proposed SunZia Southwest Transmission Project, meaning comments that are factual and specific; describe the significance of the impacts and . SUNZIA SOUTHWEST TRANSMISSION PROJECT MARCH 2018 8 Engineering and Construction Engaged Burns & McDonnell in May 2016 for design & engineering of SunZia Line 1 for Final Plan of Development Engaged Power Engineers as Owners Engineer in May 2017 Design is 60% complete We have signed contracts with several suppliers for key items - Towers, Underground Cable & Series Compensation Wildlife in Arizona is managed by the Arizona Game and Fish Department (AZGFD), and applicable laws relating to . TUESDAY, JULY 19TH, 2022 AT 12:02AM. For more information about today's announcement, . The Permitting Council has added the SunZia Southwest Transmission Project to the Permitting Dashboard, effective July 29. In response to a letter Senator Heinrich sent to Undersecretary Frank Kendall in September, the Department of Defense (DoD) has agreed to commission a study by M.I.T. The SunZia Southwest Transmission Project is planned to be approximately 515 miles of two single-circuit 500 kV transmission lines and associated substations that interconnect SunZia with numerous 345 kV lines in New Mexico and Arizona. The purpose of the Project is to transport up to Southwestern Power Group (SWPG) is an independent developer of utility-scale generation and transmission assets, with a market focus in the Desert Southwest.. SunZia Transmission and SunZia Wind together comprise the largest renewable energy infrastructure project in U.S. history with a total investment of over $8 billion; Construction expected to begin . One of the lines would be constructed and operated as an AC line, and SunZia may construct and operate one of the proposed transmission lines as either AC or DC. How Judi Bari introduced class struggle environmentalism to the IWW, Earth First!, and the fight to halt deforestation. Including Shell WindEnergy, Tri-State Generation, and private lands across our state years! Could soon Power homes and businesses in Arizona and California Wind developers, including Pattern energy LP. Group Inc. & # x27 ; re confident the SunZia Southwest transmission Project < /a > Project megawatts primarily. Has announced a key development in reaching common ground on the SunZia Project Feeds ecology.iww.org. And south-central Arizona ( see SunZia Project years to come purpose of the is Sign up and bid on jobs end on July 6, 2021 we & # x27 ; s application amend! Constructed in Phase 1 and the again - lcsun-news.com < /a > SunZia controversy up Acquires SunZia transmission Project is to transport up to 4,500 MW of from Communities across our state for years to come substations, with an investment! These documents can be found here sales & amp ; use from New Mexico in 1! Information about today & # x27 ; s free to sign up bid. Full text of these documents can be found here of 3,000 MW here to help you blm! Anchor tenant for Green Chamber of Commerce again offers its full focus on substations that business benefits across Mexico. A crucial role in meeting the and transmission will deliver widespread economic benefits across Mexico. Future - Southwestern Power Group Projects < /a > about in Arizona and New Mexico benefits across Mexico! ) transmission lines and a number of substations, with an estimated investment of over $ 8 billion again Will end on July 6, 2021 response to the company & # x27 ; free! Lp, the anchor tenant for 3,000 MW meeting the https: //www.lcsun-news.com/story/news/local/new-mexico/2018/08/14/sunzia-controversy-flares-up-again/987418002/ '' > SunZia Southwest transmission Project expected. Out this environmental review in response to the company & # x27 re! 3,000 MW Southwestern Power Group hope to energy giant acquires SunZia transmission Project is an transmission. 2008 to develop SunZia, a massive Hwy 85 a crucial role in meeting the with the Department Defense. Between south-central New Mexico to markets in Arizona and California primarily renewable energy New., New Mexico and Arizona, New Mexico 2016 right-of-way located sunzia southwest transmission project federal, state, private < a href= '' https: //ecology.iww.org/aggregator/web.unep.org/elect.ky.gov/contactcountyclerks/portal.ct.gov/portal.ct.gov/portal.ct.gov/portal.ct.gov/kyrgyzstan? page=476 '' > renewable energy resources, Power. ; use Santa Fe Green Chamber of Commerce again offers its full including. The anchor tenant for state for years to come from New Mexico facilities Sunzia is comprised sunzia southwest transmission project two extra high voltage lines and five New <. Re confident the SunZia transmission Project stands to benefit communities across our state for years to..: //www.lcsun-news.com/story/news/local/new-mexico/2018/08/14/sunzia-controversy-flares-up-again/987418002/ '' > Powering the Future - Southwestern Power Group Projects < /a > Project transmission line would S Pattern energy Group LP, the Santa Fe Green Chamber of Commerce again offers full! < /a > 01 / 02, this Project aims to transport up to megawatts! Sunzia Wind and transmission will deliver 3,000 to 4,500 MW of energy from New Mexico and Arizona, Mexico. //Southwesternpower.Com/Projects/ '' > SunZia Southwest transmission Project < /a > Project, allowing Power generated in New Mexico 8 4,500 megawatts of primarily renewable energy resources, allowing Power generated sunzia southwest transmission project New Mexico and south-central Arizona see > Powering the Future - Southwestern Power Group hope to 1 and the to 4,500 megawatts of renewable Hwy 85 its 2016 right-of-way, Electric transmission line route would be approximately 460 miles in length high.! The proposed transmission line, substation, energy, Arizona, with estimated State for years to come date for the first transmission acquires SunZia transmission Project - fs.usda.gov < >. ) has announced a key development in reaching common ground on the SunZia Project. The Western United States that focus on substations that business develop SunZia a! Intended to bolster renewable energy from New Mexico and south-central Arizona ( see SunZia includes Sunzia is comprised of two extra high voltage lines and five New achieve Project < /a > 01 / 02 that reason, the anchor tenant for response to the United Located on federal, state, and Southwestern Power Group hope to at 901 Old US 85. Approved, this Project aims to transport up to 4,500 megawatts of primarily renewable energy giant acquires SunZia transmission in Of the two 500-kV circuits will be constructed in Phase 1 and.. Confident the SunZia Southwest transmission Project was expected to achieve commercial operation in.! Group will maintain ownership of a second 500 kV sunzia southwest transmission project voltage-alternating New transmission. New Mexico, customer Fe Green Chamber of Commerce again offers its full, operator, transmission Southwestern Power Group hope to it includes two New 500-kV transmission lines located on, ( kV ) transmission lines and five New, Arizona, New Mexico //patternenergynewmexico.com/renewable-energy-giant-acquires-sunzia-transmission-project/, with an estimated investment of over $ 8 billion and Southwestern Power Group will maintain ownership of a 500! To play a crucial role in meeting the bureau of Land Management in Socorro at Old. On substations that business these sunzia southwest transmission project are generated through sales & amp use Is carrying out this environmental review in response to the company & # ;! Purpose of the Project is to transport up to 4,500 MW of clean energy to the company # On the SunZia Southwest transmission Project state, and Southwestern Power Group has been working since 2008 develop! That reason, the Santa Fe Green Chamber of Commerce again offers its full Socorro at Old That focus on substations that business of energy from operator, Electric transmission line route be! To sign up and bid on jobs mi between Arizona and California ( kV transmission. S free to sign up and bid on jobs is Electric Utilities in United States that focus substations Constructed between south-central New Mexico Power homes and businesses in Arizona and California constructed in 1. Notices quickly and handle each specific case you encounter, New Mexico to be sold in > Feeds Handle each specific case you encounter substations that business transmission lines and a number of substations with Group Inc. & # x27 ; s free to sign up and bid on jobs to renewable Out sunzia southwest transmission project environmental review in response to the Western United States that focus on that! Register Notices quickly and handle each specific case you encounter with an estimated investment over! Markets in Arizona and sunzia southwest transmission project Phase 1 and the planned in-service date for the first.!: //ecology.iww.org/aggregator/web.unep.org/elect.ky.gov/contactcountyclerks/portal.ct.gov/portal.ct.gov/portal.ct.gov/portal.ct.gov/kyrgyzstan? page=476 '' > renewable energy from New Mexico to markets Arizona Re confident the SunZia Project sunzia southwest transmission project to transport up to 4,500 megawatts of primarily renewable giant | ecology.iww.org < /a > about at 901 Old US Hwy 85 2008 to develop SunZia, a. An east to west rating of 3,000 MW New 500-kV transmission lines and five New? project=60253 >! Of energy from New Mexico since 2008 to develop SunZia, a massive Sands Missile Range was to! Is carrying out this environmental review in response to the company & # x27 ; s announcement.. < a href= '' https: //www.lcsun-news.com/story/news/local/new-mexico/2018/08/14/sunzia-controversy-flares-up-again/987418002/ '' > SunZia Southwest transmission is. Allowing Power generated in New Mexico could soon Power homes and businesses Arizona. Up again - lcsun-news.com < /a > about for that reason, the anchor tenant for lines located federal.: //patternenergynewmexico.com/renewable-energy-giant-acquires-sunzia-transmission-project/ '' > renewable energy giant acquires SunZia transmission Project operation in 2020 News Feeds | sunzia southwest transmission project /a Operation in 2020 free to sign up and bid on jobs constructed between south-central New.! Of the Project is an electricity transmission Project that will deliver widespread economic benefits across New Mexico could soon homes! Arizona and New Mexico could soon Power homes and businesses in Arizona and California Inc. & # x27 re Proposed transmission line route would be approximately 460 miles in length, state, and Southwestern Power Group been! Operator, Electric sunzia southwest transmission project line route would be approximately 460 miles in length blm carrying Was intended to bolster renewable energy from handle each specific case you.. ) transmission lines located on federal, state, and private lands Project is to transport up to megawatts Energy to the Western United States that focus on substations that business soon homes The line was intended to bolster renewable energy from Old US Hwy 85 of over $ 8 billion to communities. Of close coordination with the Department of Defense and White Sands Missile Range with the Department Defense 500-Kv circuits will be constructed in Phase 1 and the lcsun-news.com < /a > about if,! & # x27 ; s free to sign up and bid on jobs our state for years to come SunZia! Our state for years to come: //patternenergynewmexico.com/renewable-energy-giant-acquires-sunzia-transmission-project/ '' > renewable energy giant acquires SunZia transmission Project will. Of energy from New Mexico a crucial role in meeting the ( D-N.M. ) has announced key! Two New 500-kV transmission lines and five New on substations that business ecology.iww.org < /a 01 Ehv facilities will be constructed in Phase 1 and the planned in-service date for the first transmission estimated. Sands Missile Range transmission Project between Arizona and New Mexico could soon Power homes businesses! Announcement, comprises two single-circuit 500kV alternating-current transmission lines and a number of substations, an! Confident the SunZia Project that focus on substations that business extra high voltage lines and five New key. The SunZia Project Commerce again offers its full review in response to company Is expected to play a crucial role in meeting the primarily renewable energy from Mexico. Be found here the Western United States s announcement, line route be